
Semi-Automatic Hydraulic Double-Head Bending Machine
The product is controlled by a microcomputer and driven by hydraulic pressure. The display operating system is Chinese menu style, with various pre made bending angles, Chinese subtitle display, and human-machine dialogue operation.
DW63NCB pipe bending machine
Introduction
The product is controlled by a microcomputer and driven by hydraulic pressure. The display operating system is Chinese menu style, with various pre made bending angles, Chinese subtitle display, and human-machine dialogue operation. Manual, semi-automatic, and fully automatic operation modes can be freely selected. The mobile foot switch has both start and stop functions.
The hydraulic system, control system, drive system, display system, etc. are all imported components with high reliability, high precision, high efficiency, suitable for mass production, and have advanced international and domestic levels.
It is a semi-automatic pipe bending machine with a fully functional device for bending pipe fittings, and the entire bending process is automatically completed by inputting the program. The whole machine has the characteristics of easy operation, stable performance, high work efficiency, and high safety factor, making it an ideal equipment for the pipe fitting processing industry.
Details Introduction
Add wear-resistant copper plates on both sides of the slider and use double screw seats
Wear resistant, easy to maintain
Auxiliary push installation bracket, more stable imported encoder, precise angle
Built in copper tube oil cooler the Taihu Lake special motor, copper wire winding
Yongling Oil Pump Qiyang Electromagnetic Valve
Main configurations








External requirements for machine tools (water, electricity, gas)
Electricity: The equipment voltage is 380V, and the connecting cable should not be less than six square meters.
Water: Water cooling pump.
Configuration list and vulnerable parts
Machine Tool Configuration List Same as Three
Vulnerable parts include mold core pulling and wrinkle resistant plates
Machine Tool Quality Acceptance Terms and Delivery Deadline
1. Before delivery, the manufacturer shall conduct a detailed and comprehensive inspection of the quality, specifications, performance, quantity, and weight of the goods,
2. After the goods arrive at the site, the buyer shall organize acceptance within 5 days, prepare an acceptance memorandum, and sign acceptance opinions.
3. The buyer has the right to dispatch personnel to supervise the manufacturing process of the goods, and the seller is obliged to provide convenience for the buyer's supervision personnel to exercise this right.
4. The pipe bending machine should not have wrinkling or cracking during operation.
5. The delivery time is ten working days.
Equipment technical services and training terms
1. The second party is responsible for guiding the first party in installing and debugging the equipment.
2. The second party shall provide free training to the relevant personnel of the first party to enable them to independently operate and process qualified product parts.
3. The second party shall input the bending program according to the drawings of the first party.
Hot Tags: semi-automatic hydraulic double-head bending machine, China semi-automatic hydraulic double-head bending machine manufacturers, suppliers, factory, Semi Automatic Hydraulic Double Head Bending Machine, NC Bending Machine, Copper Tube Bending Machine, Automatic CNC Hydraulic Double Head Bending Machine
Send Inquiry















